Pre-engineered steel buildings are efficiently designed and factory-made structural frames that are assembled and erected on site.
Prefabricated building components are built to the exact specifications in the design.
The average construction period is 6 to 8 weeks, compared to 20 to 26 weeks for conventional buildings.
Efficient designs can be up to 30% lighter, which means less steel, less wastage and the potential for cost savings
Reduction in construction time as the erection process is faster and much easier with simplicity of connections.
Pre-engineered designs can be supplied with fascias, canopies, curved eaves and various wall systems precise concrete walls, curtain walls and block walls. They can be easily expanded in length, width and height by pre-design for future expansion.
The complete building package is supplied by a single vendor. All prefabricated building components and accessories are assured and is a major benefit of pre-engineered building systems.